Summit Structural

Pre-Engineered Metal Building(PEMB)

Specialists in Pre-Engineered Metal Building Construction & Installation

Summit Structural specializes in the construction and installation of pre-engineered metal buildings (PEMB). Designed and fabricated in a factory to your exact site specifications, PEMB systems arrive ready to assemble — cutting weeks off construction timelines without sacrificing strength.

Our team installs complete PEMB systems including structural steel framing, roof systems, wall panels, and insulated metal panels for commercial and industrial projects across the Southeast and Midwest.

Built for Speed, Strength & Scale

Pre-engineered metal buildings are particularly valuable for businesses that need large open spaces and rapid construction schedules. We deliver them for the industries that depend on them most.

  • Warehouses and distribution centers
  • Manufacturing and production facilities
  • Aviation hangars and clear-span structures
  • Commercial retail and office buildings
  • Industrial workshops and equipment housing
  • Multi-tenant and mixed-use developments

What We Install

Complete PEMB Systems

Structural Steel Framing

Tapered columns, rafters, purlins, and girts — engineered and fabricated to your exact site loads

Roof Systems

Standing-seam and screw-down metal roofing engineered for long-term weather resistance and durability

Wall Panels

Steel wall systems and trim packages installed with the precision the factory tolerances demand

How PEMB Works

From Factory to Finished Building

PEMB is a streamlined building system. Components are manufactured off-site, then erected by experienced crews. Here is how a project moves from design to standing structure.

1

Engineered

An engineer designs the building for your site, dimensions, wind and snow loads, building use, and local code.

2

Fabricated

The factory cuts, drills, welds, and labels every piece, including columns, rafters, purlins, girts, panels, and trim.

3

Delivered

The kit ships to your site as numbered, ready-to-assemble components with most connections pre-fitted.

4

Erected

Our experienced crews anchor, bolt, and assemble the system fast, safe, and with minimal on-site fabrication.

Why Owners & Contractors Choose PEMB

PEMB systems offer a combination of speed, cost predictability, and structural strength that traditional construction rarely matches.

  • Faster construction — pre-engineered components arrive ready to assemble, cutting weeks off the schedule.
  • Cost efficiency — factory fabrication reduces labor, waste, and on-site change orders.
  • Exceptional structural strength — engineered for the exact loads of each location and use.
  • Wide clear-span layouts — open interiors with no columns interrupting your floor plan.
  • Future flexibility — PEMB systems can be designed to accommodate expansion and reconfiguration later on.
  • Decades of performance — durable systems with low maintenance and long lifespans.

PEMB vs. Traditional Steel Construction

Both are valid for commercial and industrial work. Here is how they compare on the things that actually drive project decisions.

Project FactorPEMBTraditional Steel
Engineering & designFactory pre-engineered to site specCustom-engineered project-by-project
FabricationFactory pre-cut, pre-drilled, pre-weldedPartly on-site, more field cutting & welding
Construction speedFaster – kit arrives ready to assembleSlower – more on-site work required
Cost predictabilityVery predictable upfrontMore variable, more change orders
ConnectionsMostly boltedMix of bolted and welded
Best forWarehouses, hangars, industrial, retailComplex geometry, irregular shapes, specialty loads

Frequently Asked Questions

A pre-engineered metal building is a structural steel system designed and fabricated in a factory to fit the exact specifications of your project — site, dimensions, wind and snow loads, building use, and local code. Every component arrives ready to assemble with bolted connections and minimal field modifications, which is what makes the construction process so much faster than traditional methods.

Yes. We offer install-only services for clients who’ve already sourced their own PEMB kit. We’ll review the package, prep the site, and erect it on your timeline.

A complete PEMB installation includes structural steel framing (columns, rafters, purlins, girts), roof systems, wall panels, and where specified, insulated metal panels. We handle all bolted connections, anchor bolts to foundation, and final trim work.

Most commercial PEMB projects run 12–24 weeks from groundbreaking to completion, depending on size, finishes, and site conditions. PEMB systems are typically faster than traditional steel construction because the structural components arrive pre-engineered and pre-fabricated.